| October 1967 |
Capital fund 1,000,000 yen
Built a factory (35㎡) as Iwashita Mold Manufacturing.
Started the business of manufacturing molds for car bodies and parts. |
| April 1971 |
Expanded the factory to 70㎡. |
| September 1975 |
Expanded the factory to 220㎡ for the purpose of enhancement of equipment and improvement of operating efficiency.
Added a Die Spotting Press for improving operating efficiency. |
| October 1976 |
Increased the paid-up capital to 5,000,000 yen. |
| August 1980 |
Expanded the factory to 370㎡ for dealing with increased orders. |
| November 1980 |
Introduced a large NC planer-type tracing machine ahead of other companies. |
| October 1982 |
Increased the paid-up capital to 15,000,000 yen.
|
| August 1985 |
Newly built factory (1,000㎡) and Administration Office Building (105㎡) to improve the layout for better operating process efficiency.
Introduced a 500t trial press.
|
| October 1990 |
Newly built Yabuzuka Machining Factory.
Introduced a digitizer CAD/CAM system, also introduced 3 planer-type machining units, and started to manufacture molds using optical fibers under complete concavo-convex number control.
|
| April 1991 |
Changed the company name to IKKIS Co., Ltd. |
| August 1997 |
Expanded the Finishing Factory by 1,000㎡. |
| August 1998 |
Added a 3D Laser Cutting Machine. |
| August 2000 |
Expanded the Finishing Factory by 1000㎡. |
| November 2003 |
Expanded the Finishing Factory by 1000㎡. |
| November 2005 |
Newly built the Machining Factory (2400㎡).
Added a 3D Simulation (PAM-STAMP).
Added 3 Machining units.
|
| 2006 |
Expanded the Third Finishing Factory by 1500㎡.
100t 3500×2000 Die Spotting Press.
Added 3D Non-Contact-Measuring Machine VECTRON.
Added 20t and 7.5t cranes. |
| 2007 |
Expanded the Servo Press Factory and the Prototype Testing Factory by 1000㎡.
1000t Hybrid Servo Press (Komatsu).
Added a 15t crane with coil line and a 5t crane. |
| 2010 |
Added a large 5-Axes Machining. |
| March 2013 |
3 members of staff accredited as the Mold Meisters by Gunma Die and Mold Association. |
| October 2016 |
Added a large 5-Axes Machining.
(OKUMA MCR-A5CⅡ) |
| August 2017 |
Increased the paid-up capital to 30,000,000 yen. |
| October 2019 |
Newly built The Fifth Factory (2405㎡).
Added a 1500t Mechanical Press. |
| December 2019 |
Added a large Machining. |
| September 2020 |
Signed up to SDGs (Sustainable Development Goals).. |
| December 2020 |
Added a large Machining. |